My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FY2019 FINAL Cost Recovery Fee Schedule
>
Budget Documents
>
FY2019 Budget Documents
>
FY2019 FINAL Cost Recovery Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 11:00:11 AM
Creation date
9/13/2018 8:03:01 AM
Metadata
Fields
Template:
Finance Documents
Function
Budget
Document Type
Support
Record Status
Final Record
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ATTACHMENT XX <br />Cost Recovery Fee Schedule <br />Permit Cost Recovery Schedule (One Time)FY19 Fee <br />Right-of-Entry Permit Actual Cost * <br />Right-of-Entry Permit Amendment/Extension Actual Cost * <br />Special Event Permit Actual Cost * <br />Plan/Work Plan Review Process (hourly rate): <br />Submittal Review Actual Cost * <br />Right-of-Way Support Services FY19 Fee <br />Contractor Safety Training (Roadway Worker Protection): <br />Class per participant $156.97 <br />Flag Protection - hourly rate $71.78 <br />Mark Out of Utilities - hourly rate $76.00 <br />* Actual cost is generated from NCTD labor time applied to a specific process at a fully burdened <br />hourly rate, plus costs incurred by NCTD directly related to the requested activity. Fully burdened <br />hourly rates applied by NCTD include the base compensation of NCTD staff that are engaged in <br />the requested activity, plus the associated employee benefits incurred by NCTD for that staff <br />member such as payroll taxes, medical benefits, retirement plans, etc. <br />Page 1
The URL can be used to link to this page
Your browser does not support the video tag.