My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FY2020 Cost Recovery Fee Schedule
>
Budget Documents
>
FY2020 Budget Documents
>
FY2020 Cost Recovery Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:45:53 AM
Creation date
7/23/2019 2:51:23 PM
Metadata
Fields
Template:
Finance Documents
Function
Budget
Document Type
Support
Date
7/23/2019
Record Status
Final Record
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Permit Cost Recovery Schedule (One Time)FY19 FY20 <br />Right-of-Entry Permit Actual Cost *Actual Cost * <br />Right-of-Entry Permit Amendment/Extension Actual Cost *Actual Cost * <br />Special Event Permit Actual Cost *Actual Cost * <br />Plan/Work Plan Review Process (hourly rate): <br />Submittal Review Actual Cost *Actual Cost * <br />Right-of-Way Support Services FY19 FY20 <br />Contractor Safety Training (Roadway Worker Protection): <br />Class per participant $157.34 $162.06 <br />Flag Protection - hourly rate $71.96 $74.12 <br />Mark Out of Utilities - hourly rate $76.18 $78.47 <br />Incidental Use Fees FY19 FY20 <br />Set-Up and Administration <br />Incidental Use Viability, Negotiations & License Set-Up Fee (One-Time)$1,500 $1,500 <br />Administration Fee (Recurring Annually)$190 $190 <br />Incidental Use Fees (Recurring Annually) <br />Standard Transverse Wireline Crossing (Electric, Telephone, CATV) $2,000 $2,000 <br />Telecommunication Fiber Optic Cable (0 - 432 strands)$4,500 $4,500 <br />Telecommunication Fiber Optic Cable (>432 strands)$10.42/strand per cable $10.42/strand per cable <br />Pipeline Utility Crossing (Sewer/Water/Storm Drain) <br /><0”-10” diameter $1,450 $1,450 <br />>10”-24” diameter $1,900 $1,900 <br />>24”-30” diameter $2,500 $2,500 <br />>30”-42” diameter $3,500 $3,500 <br />>42”-52” diameter $4,500 $4,500 <br />>52” diameter Case by Case Case by Case <br />Longitudinal installations <br />Standard Wireline (Electric, Telephone, CATV) (≤ 200 feet in length)$2,000 $2,000 <br />Standard Wireline (Electric, Telephone, CATV) (> 200 feet in length)$10/linear foot $10/linear foot <br />Pipeline Utility (Sewer/Water/Storm Drain) <br /><0”-10” diameter (≤ 200 feet in length)$1,450 $1,450 <br /><0”-10” diameter (> 200 feet in length)$7.25/linear foot $7.25/linear foot <br />>10”-24” diameter (≤ 200 feet in length)$1,900 $1,900 <br />>10”-24” diameter (> 200 feet in length)$9.50/linear foot $9.50/linear foot <br />>24”-30” diameter (≤ 200 feet in length)$2,500 $2,500 <br />>24”-30” diameter (> 200 feet in length)$12.50/linear foot $12.50/linear foot <br />>30”-42” diameter (≤ 200 feet in length)$3,500 $3,500 <br />>30”-42” diameter (> 200 feet in length)$17.50/linear foot $17.50/linear foot <br />>42”-52” diameter (≤ 200 feet in length)$4,500 $4,500 <br />>42”-52” diameter (> 200 feet in length)$22.50/linear foot $22.50/linear foot <br />>52” diameter Case by Case Case by Case <br />Incidental Use Fees (One-Time) <br />Guy wires, arms, brackets and service drops $500 $500 <br />COST RECOVERY FEE SCHEDULE <br />* Actual cost is generated from NCTD labor time applied to a specific process at a fully burdened hourly rate, plus costs incurred by NCTD <br />directly related to the requested activity. Fully burdened hourly rates applied by NCTD include the base compensation of NCTD staff that <br />are engaged in the requested activity, plus the associated employee benefits incurred by NCTD for that staff member such as payroll taxes, <br />medical benefits, retirement plans, etc.
The URL can be used to link to this page
Your browser does not support the video tag.