My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FY2017 Cost Recovery Fee Schedule
>
Budget Documents
>
FY2017 Budget Documents
>
FY2017 Cost Recovery Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 11:08:54 AM
Creation date
7/13/2017 2:11:37 PM
Metadata
Fields
Template:
Finance Documents
Function
Budget
Date
7/13/2017
Record Status
Pending
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Cost Recovery Fee Schedule <br />FY15 Fee FY16 Fee FY17 Fee <br />Permit Cost Recovery Schedule (One Time) <br />Right-of-Entry Permit Actual Cost *Actual Cost *Actual Cost * <br />Right-of-Entry Permit Amendment/Extension Actual Cost *Actual Cost *Actual Cost * <br />Special Event Permit Actual Cost *Actual Cost *Actual Cost * <br />Contractor Safety Training: <br />Class (per participant)$86 $80 $149.83 <br />On-line N/A N/A N/A <br />Plan/Work Plan Review Process (hourly rate): <br />Submittal Review Actual Cost *Actual Cost *Actual Cost * <br />Flag Protection (hourly rate)$73 $70 $68.52 <br />Mark Out of Utilities $82 $80 $72.54 <br />Mark Out of Utilities - Overtime $99 $101 N/A <br />Utility Perpendicular Type Crossing (Recurring) <br />Electrical O/H <69kV $1,000 $1,000 $1,000 <br />Electrical O/H ≥69kV case by case case by case case by case <br />Electrical U/G <69kV $1,500 $1,500 $1,500 <br />Electrical U/G ≥69kV case by case case by case case by case <br />Natural Gas U/G <12"$1,500 $1,500 $1,500 <br />Natural Gas U/G ≥12"case by case case by case case by case <br />Pole, guy or misc. - surface $750 minimum $750 minimum $750 minimum <br />Telephone, cable, other - O/H $1,000 $1,000 $1,000 <br />Telephone, cable, other - U/G $1,500 $1,500 $1,500 <br />Sewer, water, storm drain pipeline - U/G <36"$1,000 $1,000 $1,000 <br />Sewer, water, storm drain pipeline - U/G ≥36"case by case case by case case by case <br />Note: Longitudinal installations are evaluated on a case by case basis <br />O/H = Overhead <br />U/G = Underground <br />* Actual cost is generated from NCTD labor time applied to a specific process at a fully burdened hourly rate, plus costs incurred by <br />NCTD directly related to the requested activity. Fully burdened hourly rates applied by NCTD include the base compensation of NCTD <br />staff that are engaged in the requested activity, plus the associated employee benefits incurred by NCTD for that staff member such as <br />payroll taxes, medical benefits, retirement plans, etc. <br />Page 1
The URL can be used to link to this page
Your browser does not support the video tag.